A sewage treatment plant is a modern, environmentally friendly system used to treat wastewater from properties not connected to the mains sewer. Unlike older septic tanks, these systems actively break down waste through internal processes, producing a much cleaner discharge that meets current environmental standards.
They are now the preferred solution for off-mains drainage, particularly where existing septic tanks no longer comply with Environment Agency rules introduced in 2020.
Sewage treatment plant installations are ideal for:
If you are unsure whether your property is compliant or suitable for a sewage treatment plant, Drain Division can advise.
Step one: Site survey
We begin with a detailed survey of your property to assess ground conditions, drainage routes and installation space.
Step two: System design
We calculate your household or site’s capacity needs and recommend a treatment plant that meets both performance and legal requirements.
Step three: Installation
Our qualified engineers install the system with minimal disruption, managing all excavation, pipework and connections.
Step four: Testing and handover
After installation, we test the plant thoroughly and provide guidance on use and maintenance. Full documentation is supplied for records and compliance.
Sewage treatment plants offer:
All Drain Division installations come with a 10-year workmanship guarantee for peace of mind.
Contact our team of experts today. Our offices are open 6am to midnight 7 days a week.